Port Said Shipyard

‘Fakhr Al-Kanah’ floating dock arrives with payload of 35,000 tons to join Port Said Shipyard
Egypt

‘Fakhr Al-Kanah’ floating dock arrives with payload of 35,000 tons to join Port Said Shipyard

Chairman of the Suez Canal Authority Osama Rabie said the South Korean-built “Fakhr Al-Kanah” floating dock has been shipped to…
Back to top button