Chief of the Egyptian Company for Metro Management and Operations Ali Fadali signed a contract with the Spanish consulting firm E2F to study a new power supply network on the first and second metro lines and examine the current network's load capacity.
This is a preliminary step in increasing the number of metros operating on the first and second lines and providing air conditioning to the train cabins.
The projected completion date of the study is within seven months of the contract signing.
Edited translation from Al-Masry Al-Youm