Egypt

Up to 93% of New Suez Canal dredging work completed

A total of 242.1 million cubic meters of water-saturated sand have so far been lifted at the New Suez Canal project, the new canal daily report said.

The figure represents about 93 percent of the targeted 258 million cubic meters that should be dredged, added the report.

Related Articles

Back to top button